ORC Week 3: Shower tile installed!

 
ORC-Guest-400x218.png
 
IMG_3737-Edit.jpg

We have tile!!! If I’m being honest, the tile isn’t 100% done… I still have to clean up grout haze, grout the shower niche (I think I’m going to grout that with white grout, which I didn’t have on hand), and caulk everything. Details, details. I always drag my feet on the details.

Tile was the biggest project in here, and the next biggest is to move plumbing, which I’m going to hire out. I’m moving the vanity to the wall under the mirror, so we need the sink plumbing to be there as well. Since we are in the midst of selling our other house, though, I may wait on that and try to button up some of the less daunting projects like finishing the drywall, installing shiplap on the ceiling, and re-doing the wall texture to feel more natural.

Make sure to check out all the other One Room Challenge participant projects here!